Risk/investment-driven transmission expansion planning with multiple scenarios

Nenhuma Miniatura disponível

Data

2013-07-31

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Acesso restrito

Resumo

This study presents a new methodology based on risk/investment to solve transmission network expansion planning (TNEP) problem with multiple future scenarios. Three mathematical models related to TNEP problems considering multiple future generation and load scenarios are also presented. These models will provide planners with a meaningful risk assessment that enable them to determine the necessary funding for transmission lines at a permissible risk level. The results using test and real systems show that the proposed method presents better solutions compared with scenario analysis method. ©The Institution of Engineering and Technology 2013.

Descrição

Idioma

Inglês

Como citar

IET Generation, Transmission and Distribution, v. 7, n. 2, p. 154-165, 2013.

Itens relacionados

Financiadores