Fuchigami, Helio YochihiroSarker, RuhulRangel, Socorro [UNESP]2018-12-112018-12-112018-04-01Algorithms, v. 11, n. 4, 2018.1999-4893http://hdl.handle.net/11449/170867The number of just-in-time jobs maximization in a permutation flow shop scheduling problem is considered. A mixed integer linear programming model to represent the problem as well as solution approaches based on enumeration and constructive heuristics were proposed and computationally implemented. Instances with up to 10 jobs and five machines are solved by the mathematical model in an acceptable running time (3.3 min on average) while the enumeration method consumes, on average, 1.5 s. The 10 constructive heuristics proposed show they are practical especially for large-scale instances (up to 100 jobs and 20 machines), with very good-quality results and efficient running times. The best two heuristics obtain near-optimal solutions, with only 0.6% and 0.8% average relative deviations. They prove to be better than adaptations of the NEH heuristic (well-known for providing very good solutions for makespan minimization in flow shop) for the considered problem.engFlow shopHeuristicsJust-in-time schedulingNear-optimal heuristics for just-in-time jobs maximization in flow shop schedulingArtigo10.3390/a11040043Acesso aberto2-s2.0-850449861412-s2.0-85044986141.pdf