Publicação: Erratum: Analysis of production resources improvement strategies in make-to-stock environments managed by the simplified drum-buffer-rope system (Gestão & Produção (2021) 28:4 (e55) DOI: 10.1590/1806-9649-2021v28e55)
Carregando...
Data
Orientador
Coorientador
Pós-graduação
Curso de graduação
Título da Revista
ISSN da Revista
Título de Volume
Editor
Tipo
Errata
Direito de acesso
Resumo
Due to author's honest mistake the article “Analysis of production resources improvement strategies in make-to-stock environments managed by the simplified drum-buffer-rope system” (https://doi.org/10.1590/1806-9649-2021v28e55), published in Gestão & Produção, 28(4), e55, was published with errors. On page 27, where the text reads: Goldratt, E. M. (2009). Standing on the shoulders of giants: production concepts versus production applications: The Hitachi Tool Engineering example. Project Management Journal, 16(3), 333-343. It should read: Goldratt, E. M. (2009). Standing on the shoulders of giants: production concepts versus production applications: The Hitachi Tool Engineering example. Gestão & Produção, 16(3), 333-343. http://dx.doi.org/10.1590/S0104-530X2009000300002. On page 28, where the text reads: Pacheco, D. A. J., Lacerda, D. P., Corcini, S. L. H. No., Jung, C. F., & Antunes, J. A. V. Jr. (2014). Flow balancing or capacity balancing? Systemic analysis and propositions. Project Management Journal, 21(2), 355-367. Souza, F. B., & Baptista, H. R. (2010). Proposal of enhancement for the Simplified Drum-Buffer-Rope method applied to make-to-order production environments. Project Management Journal, 17(4), 735-746. Souza, F. B., & Pires, S. R. I. (1999). Analysis and propositions about the balancing and use of over capacity in productive resources. Project Management Journal, 6(2), 111-126. Souza, F. B., & Pires, S. R. I. (2014). Making to availability: an application of the Theory of Constraints in make-to-stock environments. Project Management Journal, 21(1), 65-76. Souza, F. B., Rentes, A. F., & Agostinho, L. O. (2002). The relationship between production planning and control systems and methods of capacity allocation. Project Management Journal, 9(2), 215-234. It should read: Pacheco, D. A. J., Lacerda, D. P., Corcini Neto, S. L. H., Jung, C. F., & Antunes Júnior, J. A. V. (2014). Balanceamento de fluxo ou balanceamento de capacidade? análises e proposições sistêmicas. Gestão & Produção, 21(2), 355-368. http://dx.doi.org/10.1590/S0104-530X2014005000006. Souza, F. B., & Baptista, H. R. (2010). Proposta de avanço para o método Tambor-Pulmão-Corda Simplificado aplicado em ambientes de produção sob encomenda. Gestão & Produção, 17(4), 735-746. http://dx.doi.org/10.1590/S0104-530X2010000400008. Souza, F. B., & Pires, S. R. I. (1999). Análise e proposições sobre o balanceamento e uso de excesso de capacidade em recursos produtivos. Gestão & Produção, 6(2), 111-126. http://dx.doi.org/10.1590/S0104-530X1999000200004. Souza, F. B., & Pires, S. R. I. (2014). Produzindo para disponibilidade: uma aplicação da Teoria das Restrições em ambientes de produção para estoque. Gestão & Produção, 21(1), 65-76. http://dx.doi.org/10.1590/S0104-530X2013005000007. Souza, F. B., Rentes, A. F., & Agostinho, O. L. (2002). A interdependência entre sistemas de controle de produção e critérios de alocação de capacidades. Gestão & Produção, 9(2), 215-234. http://dx.doi.org/10.1590/S0104-530X2002000200008. The authors apologize for the errors.
Descrição
Palavras-chave
Idioma
Inglês
Como citar
Gestao e Producao, v. 28, n. 4, 2021.