Logotipo do repositório

Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups

dc.contributor.authorde Araujo, Silvio A.
dc.contributor.authorArenales, Marcos N.
dc.contributor.authorClark, Alistair R.
dc.contributor.institutionUniv W England
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionUniversidade de São Paulo (USP)
dc.date.accessioned2014-05-20T15:24:43Z
dc.date.available2014-05-20T15:24:43Z
dc.date.issued2007-08-01
dc.description.abstractA lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.en
dc.description.affiliationUniv W England, Fac Comp Engn & Math Sci, Bristol BS16 1QY, Avon, England
dc.description.affiliationUniv Estadual Paulista, Sao Jose do Rio Preto, Brazil
dc.description.affiliationUniv São Paulo, BR-13560 Sao Carlos, Brazil
dc.description.affiliationUnespUniv Estadual Paulista, Sao Jose do Rio Preto, Brazil
dc.format.extent337-358
dc.identifierhttp://dx.doi.org/10.1007/s10732-007-9011-9
dc.identifier.citationJournal of Heuristics. Dordrecht: Springer, v. 13, n. 4, p. 337-358, 2007.
dc.identifier.dimensionspub.1014480232
dc.identifier.doi10.1007/s10732-007-9011-9
dc.identifier.issn1381-1231
dc.identifier.issn1572-9397
dc.identifier.orcid0000-0002-4762-2048
dc.identifier.orcid0000-0002-4239-0321
dc.identifier.urihttp://hdl.handle.net/11449/35279
dc.identifier.wosWOS:000248116400002
dc.language.isoeng
dc.publisherSpringer
dc.publisherSpringer Nature
dc.relation.ispartofJournal of Heuristics
dc.relation.ispartofjcr1.129
dc.relation.ispartofsjr1,008
dc.rights.accessRightsAcesso restritopt
dc.sourceWeb of Science
dc.sourceDimensions
dc.subjectlot-sizingpt
dc.subjectschedulingpt
dc.subjectsequence-dependent setup costs and timespt
dc.subjectfix-and-relaxpt
dc.subjectlocal searchpt
dc.titleJoint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setupsen
dc.typeArtigopt
dcterms.licensehttp://www.springer.com/open+access/authors+rights?SGWID=0-176704-12-683201-0
dcterms.rightsHolderSpringer
dspace.entity.typePublication
relation.isOrgUnitOfPublication43c38943-bd6f-4fb6-a9a5-8482a1f632c0
relation.isOrgUnitOfPublication.latestForDiscovery43c38943-bd6f-4fb6-a9a5-8482a1f632c0
unesp.campusUniversidade Estadual Paulista (UNESP), Instituto de Biociências, Letras e Ciências Exatas, São José do Rio Pretopt

Arquivos