Aplicação de método de tomada de decisão multicritério para priorização de projetos Lean Six Sigma

dc.contributor.advisorFranco, Bruno Chaves [UNESP]
dc.contributor.advisorOliveira, Otávio José de [UNESP]
dc.contributor.authorRolando, Daniel Augusto Rainha [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.date.accessioned2018-04-06T18:54:51Z
dc.date.available2018-04-06T18:54:51Z
dc.date.issued2018-02-16
dc.description.abstractPara a delimitação de um processo de tomada de decisão na escolha de projetos Lean Six Sigma, é necessário definir os fatores críticos, tanto de sucesso (como por exemplo: envolvimento e comprometimento da gestão, entendimento das ferramentas e técnicas do Lean Six Sigma, ligação do projeto com a estratégia de negócios) quanto de fracasso (como por exemplo a falta do envolvimento da gestão, resistência à mudança cultural, inexistência de gestão de projetos). Desta forma, este trabalho foi conduzido por meio de modelagem com validação de dados reais, com o objetivo de propor uma adaptação de métodos de auxílio à tomada a decisão para seleção de projetos Lean Six Sigma baseado nos fatores críticos de sucesso e fracasso. Para tanto, com base na revisão da literatura, foram identificados os fatores críticos de sucesso e fracasso para seleção de projetos Lean Six Sigma. Em seguida, uma análise de dois métodos de tomada de decisão multicritério, PROMETHEE e ANP, foi realizada por meio da aplicação dos modelos em um portfólio de projetos de uma empresa multinacional de grande porte. Como resultado, houve assertividade de 95% na seleção dos melhores projetos do portfólio, comparado aos projetos executados pela empresa mostrando-se que os dois modelos são aderentes ao problema. Como resultado, é possível constatar que o PROMETHEE se mostrou mais assertivo, principalmente nas comparações quantitativas, tendo aplicabilidade tanto para decisões individuais quanto em grupos. O ANP, por fazer a análise de preferência dos critérios de forma pareada (utilizando a escala comparativa de Saaty) torna mais fácil seu em grupos grandes de decisores, porém a comparação utilizando a escala de Saaty dificulta a análise de critérios quantitativos, bem como para pequenos grupos ou em decisões individuais.pt
dc.description.abstractTo define a decision-making process in the Lean Six Sigma projects’ choice, it is necessary to define the critical success factors (e. g., management involvement and commitment, understanding the tools and techniques of Lean Six Sigma methodologies), and critical failure factors (e. g., lack of management involvement, cultural change resistance, project management weakness, etc.). In this way, this work was conducted through the modeling method with the objective of proposing an adaptation of decision-making aid methods process to select Lean Six Sigma projects based on the critical success and critical failure factors. Therefore, based on the literature review, the critical success and critical failure factors for the selection of Lean Six Sigma projects were identified. An analysis of two multi-criteria decision-making methods, PROMETHEE and ANP, was performed through the application of the models in a project portfolio of a large multinational company, presenting 95% assertiveness in the selection of the best portfolio projects compared to the executed projects by the company, showing that the two models are adherent to the problem. In addition, PROMETHEE has been more assertive, mainly in quantitative comparisons, and the use of the method are applied for both individual and group decisions; the ANP, by doing the preference analysis of the criteria in pair-to-pair way, using the Saaty’s comparative scale, makes it easier in large groups of decision makers. However, the comparison using the Saaty scale makes it difficult to analyze quantitative criteria as well as small groups or in individual decisionsen
dc.identifier.aleph000899452
dc.identifier.capes33004080052P0
dc.identifier.lattes8045074316518664
dc.identifier.orcid0000-0002-5192-3644
dc.identifier.urihttp://hdl.handle.net/11449/153428
dc.language.isopor
dc.publisherUniversidade Estadual Paulista (Unesp)
dc.rights.accessRightsAcesso aberto
dc.subjectTomada de decisãopt
dc.subjectLean Six Sigmaen
dc.subjectSeleção de projetospt
dc.subjectFatores Críticos de Sucessopt
dc.subjectMétodos de tomada de decisão multicritériopt
dc.subjectPROMETHEEpt
dc.subjectANPpt
dc.subjectDecision makingen
dc.subjectSelection of projectsen
dc.subjectMulti-criteria decision-making aid methodspt
dc.subjectCritical Success Factorsen
dc.subjectSeis Sigma (Padrão de controle de qualidade)pt
dc.subjectAdministração de projetospt
dc.titleAplicação de método de tomada de decisão multicritério para priorização de projetos Lean Six Sigmapt
dc.title.alternativeApplication of multi-criteria decision-making method for Lean Six Sigma projects prioritizationen
dc.typeDissertação de mestrado
dspace.entity.typePublication
unesp.advisor.lattes8045074316518664[2]
unesp.advisor.orcid0000-0002-5192-3644[2]
unesp.campusUniversidade Estadual Paulista (UNESP), Faculdade de Engenharia, Guaratinguetápt
unesp.embargoOnlinept
unesp.graduateProgramEngenharia de Produção - FEGpt
unesp.knowledgeAreaGestão de operações e sistemaspt
unesp.researchAreaNão constapt

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
rolando_dar_me_guara.pdf
Tamanho:
3.01 MB
Formato:
Adobe Portable Document Format
Descrição:

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
3.01 KB
Formato:
Item-specific license agreed upon to submission
Descrição: