Logotipo do repositório
 

Publicação:
Interior point method for long-term generation scheduling of large-scale hydrothermal systems

dc.contributor.authorAzevedo, Anibal Tavares [UNESP]
dc.contributor.authorLeite Oliveira, Aurelio Ribeiro
dc.contributor.authorSoares, Secundino
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionUniversidade Estadual de Campinas (UNICAMP)
dc.date.accessioned2014-05-20T13:28:14Z
dc.date.available2014-05-20T13:28:14Z
dc.date.issued2009-07-01
dc.description.abstractThis paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.en
dc.description.affiliationUniv Estadual Paulista, Dept Math, BR-12516410 Guaratingueta, SP, Brazil
dc.description.affiliationUniv Estadual Campinas, Dept Appl Math, BR-13083970 Campinas, SP, Brazil
dc.description.affiliationUniv Estadual Campinas, Sch Elect & Comp Engn, BR-13083852 Campinas, SP, Brazil
dc.description.affiliationUnespUniv Estadual Paulista, Dept Math, BR-12516410 Guaratingueta, SP, Brazil
dc.format.extent55-80
dc.identifierhttp://dx.doi.org/10.1007/s10479-008-0389-z
dc.identifier.citationAnnals of Operations Research. Dordrecht: Springer, v. 169, n. 1, p. 55-80, 2009.
dc.identifier.doi10.1007/s10479-008-0389-z
dc.identifier.issn0254-5330
dc.identifier.urihttp://hdl.handle.net/11449/9375
dc.identifier.wosWOS:000264880000005
dc.language.isoeng
dc.publisherSpringer
dc.relation.ispartofAnnals of Operations Research
dc.relation.ispartofjcr1.864
dc.relation.ispartofsjr0,943
dc.rights.accessRightsAcesso restrito
dc.sourceWeb of Science
dc.subjectHydrothermal generation schedulingen
dc.subjectLong-term operational planningen
dc.subjectNonlinear optimizationen
dc.subjectInterior point methoden
dc.titleInterior point method for long-term generation scheduling of large-scale hydrothermal systemsen
dc.typeArtigo
dcterms.licensehttp://www.springer.com/open+access/authors+rights?SGWID=0-176704-12-683201-0
dcterms.rightsHolderSpringer
dspace.entity.typePublication
unesp.campusUniversidade Estadual Paulista (UNESP), Faculdade de Engenharia, Guaratinguetápt
unesp.departmentMatemática - FEGpt

Arquivos

Licença do Pacote

Agora exibindo 1 - 2 de 2
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição:
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição: