A Real Test System For Power System Planning, Operation, and Reliability

dc.contributor.authorMahdavi, Meisam [UNESP]
dc.contributor.authorSabillon, Carlos [UNESP]
dc.contributor.authorAjalli, Majid
dc.contributor.authorMonsef, Hassan
dc.contributor.authorRomero, Ruben [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionShahid Beheshti Univ
dc.contributor.institutionUniv Tehran
dc.date.accessioned2018-11-26T17:48:24Z
dc.date.available2018-11-26T17:48:24Z
dc.date.issued2018-04-01
dc.description.abstractNowadays, several test systems available in the specialized literature are used to verify studies regarding power system planning or network reliability. However, there are no test systems currently available with enough information in order to endorse studies that simultaneously approach expansion planning, operation, and reliability issues. This paper introduces a real test system, including the load modeling, and generation and transmission systems. The main objective is to provide all the details and information required to evaluate methods and models developed for power system planning, operation, and reliability. The presented load modeling includes hourly, daily, weekly, monthly, and seasonal patterns. Furthermore, besides the substation data, reliability details, construction costs, and characteristics of right of ways (e.g., line length, impedance, and ratings) for the transmission system are exposed. The real transmission system presented contains 39 buses, 135 transformers, and 66 lines at two voltage levels: 230 and 400 kV. Finally, the generation system reliability data as well as operation and installation costs for each unit are also provided.en
dc.description.affiliationSao Paulo State Univ, Fac Engn Ilha Solteira Campus, Dept Elect Engn, Ilha Solteira, SP, Brazil
dc.description.affiliationShahid Beheshti Univ, Dept Elect Engn, Tehran, Iran
dc.description.affiliationUniv Tehran, Sch Elect & Comp Engn, Coll Engn, Tehran, Iran
dc.description.affiliationUnespSao Paulo State Univ, Fac Engn Ilha Solteira Campus, Dept Elect Engn, Ilha Solteira, SP, Brazil
dc.format.extent192-208
dc.identifierhttp://dx.doi.org/10.1007/s40313-017-0361-8
dc.identifier.citationJournal Of Control Automation And Electrical Systems. New York: Springer, v. 29, n. 2, p. 192-208, 2018.
dc.identifier.doi10.1007/s40313-017-0361-8
dc.identifier.fileWOS000426289500006.pdf
dc.identifier.issn2195-3880
dc.identifier.urihttp://hdl.handle.net/11449/163915
dc.identifier.wosWOS:000426289500006
dc.language.isoeng
dc.publisherSpringer
dc.relation.ispartofJournal Of Control Automation And Electrical Systems
dc.relation.ispartofsjr0,274
dc.rights.accessRightsAcesso aberto
dc.sourceWeb of Science
dc.subjectNetwork reliability
dc.subjectPower system operation
dc.subjectPower system planning
dc.subjectReal test system
dc.titleA Real Test System For Power System Planning, Operation, and Reliabilityen
dc.typeArtigo
dcterms.licensehttp://www.springer.com/open+access/authors+rights?SGWID=0-176704-12-683201-0
dcterms.rightsHolderSpringer
dspace.entity.typePublication
unesp.author.orcid0000-0002-7744-254X[5]
unesp.departmentEngenharia Elétrica - FEISpt

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
WOS000426289500006.pdf
Tamanho:
904.08 KB
Formato:
Adobe Portable Document Format
Descrição: