Optimal reactive power planning using risk analysis
Loading...
Files
External sources
External sources
Date
Advisor
Coadvisor
Graduate program
Undergraduate course
Journal Title
Journal ISSN
Volume Title
Publisher
Type
Work presented at event
Access right
Files
External sources
External sources
Abstract
In this paper, the optimal reactive power planning problem under risk is presented. The classical mixed-integer nonlinear model for reactive power planning is expanded into two stage stochastic model considering risk. This new model considers uncertainty on the demand load. The risk is quantified by a factor introduced into the objective function and is identified as the variance of the random variables. Finally numerical results illustrate the performance of the proposed model, that is applied to IEEE 30-bus test system to determine optimal amount and location for reactive power expansion. © 2013 IEEE.
Description
Keywords
Mean-variance, reactive power planning, stochastic programming, two - stage, uncertainty
Language
English
Citation
IEEE Power and Energy Society General Meeting.





