Publicação:
Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil

Nenhuma Miniatura disponível

Data

2023-01-01

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Resumo

Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.

Descrição

Idioma

Inglês

Como citar

Operations Management Research.

Itens relacionados

Financiadores

Coleções

Unidades

Departamentos

Cursos de graduação

Programas de pós-graduação