Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil

dc.contributor.authorDe Oliveira, Ualison Rébula
dc.contributor.authorde Souza, Hilda Anatiely Donato
dc.contributor.authorMenezes, Carlos Augusto Gabriel [UNESP]
dc.contributor.authorRocha, Henrique Martins
dc.contributor.institutionUniversidade Federal Fluminense (UFF)
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)
dc.contributor.institutionUniversidade do Estado do Rio de Janeiro (UERJ)
dc.date.accessioned2023-07-29T13:10:51Z
dc.date.available2023-07-29T13:10:51Z
dc.date.issued2023-01-01
dc.description.abstractEquipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.en
dc.description.affiliationUniversidade Federal Fluminense (UFF) / MPA-PPGA MSG and PPSIG, 783 Des. Ellis Hermydio Figueira St
dc.description.affiliationUniversidade Federal Fluminense (UFF), 783 Desembargador Ellis Hermydio Figueira St
dc.description.affiliationUniversidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São Paulo
dc.description.affiliationUniversidade do Estado do Rio de Janeiro (UERJ), Rodovia Presidente Dutra Km 298, Rio de Janeiro
dc.description.affiliationUnespUniversidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São Paulo
dc.identifierhttp://dx.doi.org/10.1007/s12063-023-00368-x
dc.identifier.citationOperations Management Research.
dc.identifier.doi10.1007/s12063-023-00368-x
dc.identifier.issn1936-9743
dc.identifier.issn1936-9735
dc.identifier.scopus2-s2.0-85153751736
dc.identifier.urihttp://hdl.handle.net/11449/247249
dc.language.isoeng
dc.relation.ispartofOperations Management Research
dc.sourceScopus
dc.subjectAnalytic Hierarchy process
dc.subjectEquipment availability
dc.subjectMaintenance plans
dc.subjectMulticriteria decision
dc.subjectPeriodicity
dc.subjectPreventive maintenance
dc.titleStraightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazilen