Publicação: Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
dc.contributor.author | De Oliveira, Ualison Rébula | |
dc.contributor.author | de Souza, Hilda Anatiely Donato | |
dc.contributor.author | Menezes, Carlos Augusto Gabriel [UNESP] | |
dc.contributor.author | Rocha, Henrique Martins | |
dc.contributor.institution | Universidade Federal Fluminense (UFF) | |
dc.contributor.institution | Universidade Estadual Paulista (UNESP) | |
dc.contributor.institution | Universidade do Estado do Rio de Janeiro (UERJ) | |
dc.date.accessioned | 2023-07-29T13:10:51Z | |
dc.date.available | 2023-07-29T13:10:51Z | |
dc.date.issued | 2023-01-01 | |
dc.description.abstract | Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average. | en |
dc.description.affiliation | Universidade Federal Fluminense (UFF) / MPA-PPGA MSG and PPSIG, 783 Des. Ellis Hermydio Figueira St | |
dc.description.affiliation | Universidade Federal Fluminense (UFF), 783 Desembargador Ellis Hermydio Figueira St | |
dc.description.affiliation | Universidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São Paulo | |
dc.description.affiliation | Universidade do Estado do Rio de Janeiro (UERJ), Rodovia Presidente Dutra Km 298, Rio de Janeiro | |
dc.description.affiliationUnesp | Universidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São Paulo | |
dc.identifier | http://dx.doi.org/10.1007/s12063-023-00368-x | |
dc.identifier.citation | Operations Management Research. | |
dc.identifier.doi | 10.1007/s12063-023-00368-x | |
dc.identifier.issn | 1936-9743 | |
dc.identifier.issn | 1936-9735 | |
dc.identifier.scopus | 2-s2.0-85153751736 | |
dc.identifier.uri | http://hdl.handle.net/11449/247249 | |
dc.language.iso | eng | |
dc.relation.ispartof | Operations Management Research | |
dc.source | Scopus | |
dc.subject | Analytic Hierarchy process | |
dc.subject | Equipment availability | |
dc.subject | Maintenance plans | |
dc.subject | Multicriteria decision | |
dc.subject | Periodicity | |
dc.subject | Preventive maintenance | |
dc.title | Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil | en |
dc.type | Artigo | pt |
dspace.entity.type | Publication | |
unesp.author.orcid | 0000-0002-8097-4889[1] | |
unesp.campus | Universidade Estadual Paulista (UNESP), Faculdade de Engenharia e Ciências, Guaratinguetá | pt |