Optimal Restoration of Distribution Systems Considering Temporary Closed-Loop Operation

dc.contributor.authorVargas, Renzo [UNESP]
dc.contributor.authorMacedo, Leonardo H. [UNESP]
dc.contributor.authorHome-Ortiz, Juan M. [UNESP]
dc.contributor.authorRomero, Ruben [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)
dc.contributor.institutionUniversidade Federal do ABC (UFABC)
dc.date.accessioned2022-04-28T17:22:42Z
dc.date.available2022-04-28T17:22:42Z
dc.date.issued2021-12-01
dc.description.abstractThis article presents a new mathematical model to solve the restoration problem in balanced distribution systems with distributed generators (DGs) considering closed-loop topology operation during the restorative state. The restorative state is comprised of the interval of time since the permanent fault has been isolated until the time at which the faulted zone is repaired. During this interval of time, switching operations are performed to minimize the negative effects resulting from the occurrence of a permanent fault in the network. In this way, the two main objective functions of the restoration problem are to minimize the amount of load curtailment in the restored system and to minimize the number of switching operations. Conventionally, the network topology is maintained radial throughout the restorative state. In this article, the possibility of forming loops is considered for improving both objective functions. As such, a new mixed-integer second-order cone programming model is proposed, considering the temporary formation of operational loops in the restorative state, and both connected and islanded operation of the DGs. Several tests are carried out using a 53-node test system and a 2313-node system for single and multiple fault scenarios. The results obtained with the proposed model outperform the solutions achieved when only open-loop configurations are considered for the restoration problem. Moreover, it is verified that the islanded operation of the DGs provides more flexibility to the network, allowing more load to be restored.en
dc.description.affiliationSao Paulo State Univ, Dept Elect Engn, BR-15385000 Ilha Solteira, Brazil
dc.description.affiliationFed Univ ABC UFABC, Engn Modeling & Appl Social Sci Ctr, BR-09210580 Santo Andre, SP, Brazil
dc.description.affiliationUnespSao Paulo State Univ, Dept Elect Engn, BR-15385000 Ilha Solteira, Brazil
dc.description.sponsorshipCoordination for the Improvement of Higher Education Personnel
dc.description.sponsorshipBrazilian National Council for Scientific and Technological Development
dc.description.sponsorshipFundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
dc.description.sponsorshipENEL
dc.description.sponsorshipIdCoordination for the Improvement of Higher Education Personnel: 001
dc.description.sponsorshipIdBrazilian National Council for Scientific and Technological Development: 305852/2017-5
dc.description.sponsorshipIdFAPESP: 2015/21972-6
dc.description.sponsorshipIdFAPESP: 2018/20355-1
dc.description.sponsorshipIdFAPESP: 2019/01841-5
dc.description.sponsorshipIdFAPESP: 2019/19632-3
dc.description.sponsorshipIdFAPESP: 2019/23755-3
dc.description.sponsorshipIdENEL: PEE-00390-1062/2017
dc.description.sponsorshipIdENEL: P&D-00390-1083-2020_UFABC
dc.description.sponsorshipIdENEL: ANEEL 001-2016
dc.format.extent5483-5494
dc.identifierhttp://dx.doi.org/10.1109/JSYST.2021.3073941
dc.identifier.citationIeee Systems Journal. Piscataway: Ieee-inst Electrical Electronics Engineers Inc, v. 15, n. 4, p. 5483-5494, 2021.
dc.identifier.doi10.1109/JSYST.2021.3073941
dc.identifier.issn1932-8184
dc.identifier.urihttp://hdl.handle.net/11449/218732
dc.identifier.wosWOS:000728931100079
dc.language.isoeng
dc.publisherIeee-inst Electrical Electronics Engineers Inc
dc.relation.ispartofIeee Systems Journal
dc.sourceWeb of Science
dc.subjectSwitches
dc.subjectSubstations
dc.subjectNetwork topology
dc.subjectTopology
dc.subjectLinear programming
dc.subjectReactive power
dc.subjectMathematical model
dc.subjectClosed-loop topology operation
dc.subjectdistributed generation (DG)
dc.subjectdistribution systems optimization
dc.subjectmixed-integer second-order cone programming (MISOCP)
dc.subjectrestoration problem
dc.titleOptimal Restoration of Distribution Systems Considering Temporary Closed-Loop Operationen
dc.typeArtigo
dcterms.licensehttp://www.ieee.org/publications_standards/publications/rights/rights_policies.html
dcterms.rightsHolderIeee-inst Electrical Electronics Engineers Inc
dspace.entity.typePublication
unesp.author.orcid0000-0003-2287-1571[1]
unesp.author.orcid0000-0001-9178-0601[2]
unesp.departmentEngenharia Elétrica - FEISpt

Arquivos