Logo do repositório

Co-Optimization of Generation and AC Transmission Networks, Considering Reactive Power Allocation and Network Power Losses

Carregando...
Imagem de Miniatura

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Resumo

Generation and transmission network expansion planning (GTNEP) co-optimization models have been developed to enable simultaneous decisions considering investment and operational components. Most works solve the GTNEP using linearized models without considering voltage variables, reactive power constraints, and network power losses, thus resulting in a loss of model fidelity and leading to either sub-optimal or non-feasible expansion plans. Therefore, this work addresses the GTNEP problem by integrating the planning of new generation power plants, transmission lines, reactive power allocation, and the evaluation of network power losses, using the AC model to assess the operational problem. Therefore, the integrated AC-GTNEP problem is tackled using meta-heuristic optimization techniques. The approach was implemented using the Julia programming language and evaluated using the 6-bus Garver, the IEEE 24-bus, and the IEEE 118-bus test systems. The results illustrate that the proposed integrated GTNEP approach yields more cost-effective expansion plans compared to the sequential approach, with total savings of approximately 11.30%, 8.8%, and 2.5% when applied to each test system, respectively.

Descrição

Palavras-chave

AC model, co-optimization, generation expansion planning, integrated planning, transmission network expansion planning

Idioma

Inglês

Citação

IEEE Access, v. 12, p. 116428-116441.

Itens relacionados

Financiadores

Coleções

Unidades

Departamentos

Cursos de graduação

Programas de pós-graduação

Outras formas de acesso