Logotipo do repositório
 

Publicação:
The cutting stock problem with multiple manufacturing modes applied to a construction industry

dc.contributor.authorLemos, Felipe Kesrouani [UNESP]
dc.contributor.authorCherri, Adriana Cristina [UNESP]
dc.contributor.authorde Araujo, Silvio Alexandre [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.date.accessioned2020-12-12T01:14:53Z
dc.date.available2020-12-12T01:14:53Z
dc.date.issued2020-01-01
dc.description.abstractThis paper addresses the problem of multiple manufacturing modes integrated into the cutting stock problem, based on a real-life application of the concrete pole manufacturing. The main aim is to propose, formulate and test this integrated problem, which can be applied to the construction industry and other contexts of multiple manufacturing modes with cutting processes. The motivation for this proposal is the construction industry, in which reinforced concrete structures can be reinforced by various combinations of one-dimensional steel bars of varying thicknesses and lengths. An integer programming mathematical formulation is proposed aiming to minimise the total cost and to meet a demand of final products with different possible configurations. A column generation procedure is used as the solution method together with a heuristic procedure to find an integer solution. Computational results were performed with practical instances in order to assess the value of the approach and with a set of random generated instances in order to explore the influence of parameters on the results. Some managerial insights are presented.en
dc.description.affiliationFaculdade de Engenharia de Bauru UNESP–São Paulo State University
dc.description.affiliationFaculdade de Ciências UNESP–São Paulo State University
dc.description.affiliationInstituto de Biociências Letras e Ciências Exatas UNESP–São Paulo State University
dc.description.affiliationUnespFaculdade de Engenharia de Bauru UNESP–São Paulo State University
dc.description.affiliationUnespFaculdade de Ciências UNESP–São Paulo State University
dc.description.affiliationUnespInstituto de Biociências Letras e Ciências Exatas UNESP–São Paulo State University
dc.identifierhttp://dx.doi.org/10.1080/00207543.2020.1720923
dc.identifier.citationInternational Journal of Production Research.
dc.identifier.doi10.1080/00207543.2020.1720923
dc.identifier.issn1366-588X
dc.identifier.issn0020-7543
dc.identifier.scopus2-s2.0-85079367838
dc.identifier.urihttp://hdl.handle.net/11449/198513
dc.language.isoeng
dc.relation.ispartofInternational Journal of Production Research
dc.sourceScopus
dc.subjectcolumn generation
dc.subjectconstruction industry
dc.subjectcutting stock problems
dc.subjectinteger programming
dc.subjectintegrated problems
dc.subjectmultiple modes
dc.titleThe cutting stock problem with multiple manufacturing modes applied to a construction industryen
dc.typeArtigopt
dspace.entity.typePublication
unesp.author.orcid0000-0002-0488-7839[1]
unesp.author.orcid0000-0003-1934-4682[2]
unesp.author.orcid0000-0002-4762-2048[3]
unesp.campusUniversidade Estadual Paulista (UNESP), Faculdade de Engenharia, Baurupt
unesp.campusUniversidade Estadual Paulista (UNESP), Instituto de Biociências, Letras e Ciências Exatas, São José do Rio Pretopt

Arquivos