Publicação: The cutting stock problem with multiple manufacturing modes applied to a construction industry
dc.contributor.author | Lemos, Felipe Kesrouani [UNESP] | |
dc.contributor.author | Cherri, Adriana Cristina [UNESP] | |
dc.contributor.author | de Araujo, Silvio Alexandre [UNESP] | |
dc.contributor.institution | Universidade Estadual Paulista (Unesp) | |
dc.date.accessioned | 2020-12-12T01:14:53Z | |
dc.date.available | 2020-12-12T01:14:53Z | |
dc.date.issued | 2020-01-01 | |
dc.description.abstract | This paper addresses the problem of multiple manufacturing modes integrated into the cutting stock problem, based on a real-life application of the concrete pole manufacturing. The main aim is to propose, formulate and test this integrated problem, which can be applied to the construction industry and other contexts of multiple manufacturing modes with cutting processes. The motivation for this proposal is the construction industry, in which reinforced concrete structures can be reinforced by various combinations of one-dimensional steel bars of varying thicknesses and lengths. An integer programming mathematical formulation is proposed aiming to minimise the total cost and to meet a demand of final products with different possible configurations. A column generation procedure is used as the solution method together with a heuristic procedure to find an integer solution. Computational results were performed with practical instances in order to assess the value of the approach and with a set of random generated instances in order to explore the influence of parameters on the results. Some managerial insights are presented. | en |
dc.description.affiliation | Faculdade de Engenharia de Bauru UNESP–São Paulo State University | |
dc.description.affiliation | Faculdade de Ciências UNESP–São Paulo State University | |
dc.description.affiliation | Instituto de Biociências Letras e Ciências Exatas UNESP–São Paulo State University | |
dc.description.affiliationUnesp | Faculdade de Engenharia de Bauru UNESP–São Paulo State University | |
dc.description.affiliationUnesp | Faculdade de Ciências UNESP–São Paulo State University | |
dc.description.affiliationUnesp | Instituto de Biociências Letras e Ciências Exatas UNESP–São Paulo State University | |
dc.identifier | http://dx.doi.org/10.1080/00207543.2020.1720923 | |
dc.identifier.citation | International Journal of Production Research. | |
dc.identifier.doi | 10.1080/00207543.2020.1720923 | |
dc.identifier.issn | 1366-588X | |
dc.identifier.issn | 0020-7543 | |
dc.identifier.scopus | 2-s2.0-85079367838 | |
dc.identifier.uri | http://hdl.handle.net/11449/198513 | |
dc.language.iso | eng | |
dc.relation.ispartof | International Journal of Production Research | |
dc.source | Scopus | |
dc.subject | column generation | |
dc.subject | construction industry | |
dc.subject | cutting stock problems | |
dc.subject | integer programming | |
dc.subject | integrated problems | |
dc.subject | multiple modes | |
dc.title | The cutting stock problem with multiple manufacturing modes applied to a construction industry | en |
dc.type | Artigo | pt |
dspace.entity.type | Publication | |
unesp.author.orcid | 0000-0002-0488-7839[1] | |
unesp.author.orcid | 0000-0003-1934-4682[2] | |
unesp.author.orcid | 0000-0002-4762-2048[3] | |
unesp.campus | Universidade Estadual Paulista (UNESP), Faculdade de Engenharia, Bauru | pt |
unesp.campus | Universidade Estadual Paulista (UNESP), Instituto de Biociências, Letras e Ciências Exatas, São José do Rio Preto | pt |