Logo do repositório

Optimal reactive power planning using two-stage stochastic chance-constrained programming

dc.contributor.authorLopez, Julio C. [UNESP]
dc.contributor.authorMantovani, J. R.S. [UNESP]
dc.contributor.authorSanz, Javier Contreras
dc.contributor.authorMunoz, Jose I.
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)
dc.contributor.institutionUniversidad de Castilla - la Mancha
dc.date.accessioned2022-04-29T07:12:58Z
dc.date.available2022-04-29T07:12:58Z
dc.date.issued2013-12-27
dc.description.abstractIn this paper, the optimal reactive power planning considering uncertainty is presented. The classical deterministic mixed-integer nonlinear model is expanded into two-stage stochastic model with chance-constraint. This new model considers uncertainty on the demand and the equivalent availability of the reactive power sources. The concepts of expected value of perfect information (EVPI) and the value of the stochastic solution (VSS) are also studied. Finally the proposed model is applied to IEEE 30-bus test system to determine optimal amount and location for reactive power expansion. © 2013 IEEE.en
dc.description.affiliationDepartment of Electrical Engineering Electric Power Systems Planning Laboratory São Paulo State University - UNESP, Ilha Solteira, SP
dc.description.affiliationEscuela Técnica Superior de Ingenieros Industriales Universidad de Castilla - la Mancha, 13071, Ciudad Real
dc.description.affiliationUnespDepartment of Electrical Engineering Electric Power Systems Planning Laboratory São Paulo State University - UNESP, Ilha Solteira, SP
dc.identifierhttp://dx.doi.org/10.1109/PTC.2013.6652087
dc.identifier.citation2013 IEEE Grenoble Conference PowerTech, POWERTECH 2013.
dc.identifier.doi10.1109/PTC.2013.6652087
dc.identifier.scopus2-s2.0-84890868521
dc.identifier.urihttp://hdl.handle.net/11449/227395
dc.language.isoeng
dc.relation.ispartof2013 IEEE Grenoble Conference PowerTech, POWERTECH 2013
dc.sourceScopus
dc.subjectChance-constraint
dc.subjectoptimal reactive power planning
dc.subjectstochastic programming
dc.subjectuncertainty
dc.titleOptimal reactive power planning using two-stage stochastic chance-constrained programmingen
dc.typeTrabalho apresentado em evento
dspace.entity.typePublication
unesp.departmentEngenharia Elétrica - FEISpt

Arquivos