A convex chance-constrained model for reactive power planning
dc.contributor.author | López, Julio [UNESP] | |
dc.contributor.author | Pozo, David | |
dc.contributor.author | Contreras, Javier | |
dc.contributor.author | Mantovani, J. R.S. [UNESP] | |
dc.contributor.institution | Universidade Estadual Paulista (Unesp) | |
dc.contributor.institution | Pontificia Universidad Católica de Chile, Industrial and Systems Engineering Department | |
dc.contributor.institution | University of Castilla La-Mancha, Escuela Técnica Superior de Ingenieros Industriales | |
dc.date.accessioned | 2018-12-11T16:57:19Z | |
dc.date.available | 2018-12-11T16:57:19Z | |
dc.date.issued | 2015-10-01 | |
dc.description.abstract | This paper presents a new approach for long-term reactive power investment planning and operation using a multiperiod mixed-integer stochastic convex model, where load uncertainty is also included. The risk of not meeting the load with a certain level of confidence due to a reactive power deficit is represented by chance constraints. Tap settings of under-load tap-changing transformers are modeled as a set of mixed-integer linear equations. Existing and new discrete and continuous reactive power sources are modeled. These type of problem is challenging and have never been studied before. The proposed model is applied to the CIGRE-32 electric power system. | en |
dc.description.affiliation | São Paulo State University (UNESP), Department of Electrical Engineering (DEE), Ilha Solteira | |
dc.description.affiliation | Pontificia Universidad Católica de Chile, Industrial and Systems Engineering Department | |
dc.description.affiliation | University of Castilla La-Mancha, Escuela Técnica Superior de Ingenieros Industriales | |
dc.description.affiliationUnesp | São Paulo State University (UNESP), Department of Electrical Engineering (DEE), Ilha Solteira | |
dc.format.extent | 403-411 | |
dc.identifier | http://dx.doi.org/10.1016/j.ijepes.2015.03.021 | |
dc.identifier.citation | International Journal of Electrical Power and Energy Systems, v. 71, p. 403-411. | |
dc.identifier.doi | 10.1016/j.ijepes.2015.03.021 | |
dc.identifier.file | 2-s2.0-84927164512.pdf | |
dc.identifier.issn | 0142-0615 | |
dc.identifier.scopus | 2-s2.0-84927164512 | |
dc.identifier.uri | http://hdl.handle.net/11449/171827 | |
dc.language.iso | eng | |
dc.relation.ispartof | International Journal of Electrical Power and Energy Systems | |
dc.relation.ispartofsjr | 1,276 | |
dc.rights.accessRights | Acesso aberto | |
dc.source | Scopus | |
dc.subject | Chance-constrained programming | |
dc.subject | Convex model | |
dc.subject | Load shedding | |
dc.subject | Reactive power deficit | |
dc.subject | Reactive power planning | |
dc.subject | Tap settings | |
dc.title | A convex chance-constrained model for reactive power planning | en |
dc.type | Artigo | |
unesp.department | Engenharia Elétrica - FEIS | pt |
Arquivos
Pacote Original
1 - 1 de 1
Carregando...
- Nome:
- 2-s2.0-84927164512.pdf
- Tamanho:
- 7.81 MB
- Formato:
- Adobe Portable Document Format
- Descrição: