A convex chance-constrained model for reactive power planning

dc.contributor.authorLópez, Julio [UNESP]
dc.contributor.authorPozo, David
dc.contributor.authorContreras, Javier
dc.contributor.authorMantovani, J. R.S. [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionPontificia Universidad Católica de Chile, Industrial and Systems Engineering Department
dc.contributor.institutionUniversity of Castilla La-Mancha, Escuela Técnica Superior de Ingenieros Industriales
dc.date.accessioned2018-12-11T16:57:19Z
dc.date.available2018-12-11T16:57:19Z
dc.date.issued2015-10-01
dc.description.abstractThis paper presents a new approach for long-term reactive power investment planning and operation using a multiperiod mixed-integer stochastic convex model, where load uncertainty is also included. The risk of not meeting the load with a certain level of confidence due to a reactive power deficit is represented by chance constraints. Tap settings of under-load tap-changing transformers are modeled as a set of mixed-integer linear equations. Existing and new discrete and continuous reactive power sources are modeled. These type of problem is challenging and have never been studied before. The proposed model is applied to the CIGRE-32 electric power system.en
dc.description.affiliationSão Paulo State University (UNESP), Department of Electrical Engineering (DEE), Ilha Solteira
dc.description.affiliationPontificia Universidad Católica de Chile, Industrial and Systems Engineering Department
dc.description.affiliationUniversity of Castilla La-Mancha, Escuela Técnica Superior de Ingenieros Industriales
dc.description.affiliationUnespSão Paulo State University (UNESP), Department of Electrical Engineering (DEE), Ilha Solteira
dc.format.extent403-411
dc.identifierhttp://dx.doi.org/10.1016/j.ijepes.2015.03.021
dc.identifier.citationInternational Journal of Electrical Power and Energy Systems, v. 71, p. 403-411.
dc.identifier.doi10.1016/j.ijepes.2015.03.021
dc.identifier.file2-s2.0-84927164512.pdf
dc.identifier.issn0142-0615
dc.identifier.scopus2-s2.0-84927164512
dc.identifier.urihttp://hdl.handle.net/11449/171827
dc.language.isoeng
dc.relation.ispartofInternational Journal of Electrical Power and Energy Systems
dc.relation.ispartofsjr1,276
dc.rights.accessRightsAcesso aberto
dc.sourceScopus
dc.subjectChance-constrained programming
dc.subjectConvex model
dc.subjectLoad shedding
dc.subjectReactive power deficit
dc.subjectReactive power planning
dc.subjectTap settings
dc.titleA convex chance-constrained model for reactive power planningen
dc.typeArtigo
unesp.departmentEngenharia Elétrica - FEISpt

Arquivos

Pacote Original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
2-s2.0-84927164512.pdf
Tamanho:
7.81 MB
Formato:
Adobe Portable Document Format
Descrição: