A least cost transmission planning model considering operation cost

Nenhuma Miniatura disponível

Data

2014-02-05

Autores

Alayo, Jorge Hans [UNESP]

Título da Revista

ISSN da Revista

Título de Volume

Editor

Resumo

Existing transmission planning models consider basic aspects of the problem. In practice, a transmissionutility needs to model other important details such as operation cost of the power system. In this article, a least cost transmission expansion model is proposed considering the operation cost in order to model the trade-off between building new transmission capacity and increasing the power system's operation cost. The proposed model is transformed into a mixed integer linear programming problem using linearization techniques and solved with CPLEX. Finally, results of the model for the Garver test system and IEEE 24-bus test system are shown. © 2014 by Walter de Gruyter Berlin/Boston.

Descrição

Palavras-chave

disjuctive linear model, multistage model, operation cost, transmission planning

Como citar

International Journal of Emerging Electric Power Systems, v. 15, n. 2, p. 121-128, 2014.