One-dimensional multi-period cutting stock problems in the concrete industry

dc.contributor.authorSignorini, Caroline de Arruda [UNESP]
dc.contributor.authorde Araujo, Silvio Alexandre [UNESP]
dc.contributor.authorMelega, Gislaine Mara
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionUniversidade Federal de São Carlos (UFSCar)
dc.date.accessioned2021-06-25T10:25:16Z
dc.date.available2021-06-25T10:25:16Z
dc.date.issued2021-01-01
dc.description.abstractThis research looks at the production planning of hollow-core slabs integrated to the optimisation problem of the use of moulds. Considering the production process of these structures, two mathematical models are proposed for the arising problem, which consists of a one-dimensional multi-period cutting stock problem with innovative aspects regarding the multiple manufacturing modes that can be used to produce the slabs. In addition, a theoretical analysis of the proposed models is presented. These models are solved using heuristic methods, both aiming to minimise production and inventory costs. Using data based on real information provided by a company, the computational results showed that the heuristic based on the compact model performed better than the one based on the extended model, due to some characteristics specific to the problem being studied.en
dc.description.affiliationDepartamento de Matemática Universidade Estadual Paulista (Unesp)
dc.description.affiliationDepartamento de Engenharia de Produção Universidade Federal de São Carlos (UFSCar)
dc.description.affiliationUnespDepartamento de Matemática Universidade Estadual Paulista (Unesp)
dc.identifierhttp://dx.doi.org/10.1080/00207543.2021.1890261
dc.identifier.citationInternational Journal of Production Research.
dc.identifier.doi10.1080/00207543.2021.1890261
dc.identifier.issn1366-588X
dc.identifier.issn0020-7543
dc.identifier.scopus2-s2.0-85102281949
dc.identifier.urihttp://hdl.handle.net/11449/206025
dc.language.isoeng
dc.relation.ispartofInternational Journal of Production Research
dc.sourceScopus
dc.subjectcolumn generation
dc.subjecthollow-core slabs production
dc.subjectMathematical modelling
dc.subjectmulti-period cutting stock problem
dc.subjectrelax-and-fix
dc.titleOne-dimensional multi-period cutting stock problems in the concrete industryen
dc.typeArtigo
unesp.author.orcid0000-0001-5343-6260[1]
unesp.author.orcid0000-0002-4762-2048[2]
unesp.author.orcid0000-0002-8690-1947[3]

Arquivos

Coleções