Logo do repositório
 

Spinning reserve opportunity cost in hydroelectric plants

dc.contributor.authorSousa, T.
dc.contributor.authorJardini, J. A.
dc.contributor.authorMasuda, M.
dc.contributor.authorDe Lima, R. A. [UNESP]
dc.contributor.institutionIEEE
dc.contributor.institutionUniversidade de São Paulo (USP)
dc.contributor.institutionAES Tietê S. A
dc.contributor.institutionCIGRE
dc.contributor.institutionUniversidade Estadual Paulista (Unesp)
dc.contributor.institutionAES Tietê S.A
dc.date.accessioned2014-05-27T11:21:39Z
dc.date.available2014-05-27T11:21:39Z
dc.date.issued2005-10-31
dc.description.abstractStarting from the deregulated process of the Electric Sector, there was the need to attribute responsibilities to several agents and to elaborate appropriate forms of remuneration of the services rendered by the same. One of the services of great importance within this new electric sector is the Ancillary Services. Among the various types of Ancillary Services, Spinning Reserve is a service necessary for maintaining the integrity of the transmission system from either generation interruptions or load variations. This paper uses the application of the Economic Dispatch theory with the objective of quantifies the availability of Spinning Reserve supply in hydroelectric plants. The proposed methodology utilizes the generating units as well as their efficiencies so as to attend the total demand with the minimum water discharge. The proposed methodology was tested through the data provided by the Água Vermelha Hydroelectric Power Plant. These tests permitted the opportunity cost valuation to the Spinning Reserve supply in hydroelectric plants. © 2005 IEEE.en
dc.description.affiliationIEEE
dc.description.affiliationDepartment of Electrical Engineering Sao Paulo University, Sao Paulo
dc.description.affiliationAES Tietê S. A, Sao Paulo
dc.description.affiliationGAGTD Polytechnic School University of Sao Paulo
dc.description.affiliationDepartment of Electrical Engineering of the Latter Institution
dc.description.affiliationDepartment of Engineering of Energy and Electric Automation USP
dc.description.affiliationCIGRE
dc.description.affiliationIAS IEEE
dc.description.affiliationState University of Sao Paulo (UNESP)
dc.description.affiliationAES Tietê S.A
dc.description.affiliationUnespState University of Sao Paulo (UNESP)
dc.format.extent2064-2069
dc.identifierhttp://dx.doi.org/10.1109/PES.2005.1489193
dc.identifier.citation2005 IEEE Power Engineering Society General Meeting, v. 2, p. 2064-2069.
dc.identifier.doi10.1109/PES.2005.1489193
dc.identifier.scopus2-s2.0-27144527322
dc.identifier.urihttp://hdl.handle.net/11449/68455
dc.language.isoeng
dc.relation.ispartof2005 IEEE Power Engineering Society General Meeting
dc.rights.accessRightsAcesso aberto
dc.sourceScopus
dc.subjectAncillary Services
dc.subjectHydraulic Generation
dc.subjectOpportunity Cost
dc.subjectSpinning Reserve
dc.subjectAncillary services
dc.subjectHydraulic generation
dc.subjectOpportunity cost
dc.subjectSpinning reserve
dc.subjectData reduction
dc.subjectElectric power transmission
dc.subjectElectric utilities
dc.subjectHydroelectric power plants
dc.subjectIndustrial economics
dc.subjectCost accounting
dc.titleSpinning reserve opportunity cost in hydroelectric plantsen
dc.typeTrabalho apresentado em evento
dcterms.licensehttp://www.ieee.org/publications_standards/publications/rights/rights_policies.html
dspace.entity.typePublication

Arquivos

Coleções