EPB excavation in transitional mixed face: Line 5—Lilac (São Paulo Metro, Brazil)

Carregando...
Imagem de Miniatura

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Resumo

The use of Earth Pressure Balance (EPB) shields is still very modest for tunneling in urban areas in Brazil. This study analyzed and integrated geological data and excavation parameters of a segment of Route 2 (Lot 3) of the Line 5—Lilac (São Paulo Metro), between Campo Belo Station and Jesuíno Maciel Shaft. This segment is 557 m long and represents one of the first experiences on tunneling in transitional mixed face with pressurized shield machines in Brazil. The excavation performed an average advance rate of 7.7 m/day and intercepted different proportions of gneisses, saprolites, and residual soils. The results show how the excavation parameters respond to different geological materials. The sections excavated in mixed transitional ground conditions had several negative effects on the excavation process, similarly to that described in other projects worldwide. Finally, results also suggested the nominal torque was insufficient for excavation of the segment.

Descrição

Palavras-chave

EPB, Excavation parameters, Lithological profile, Mixed face, TBM

Idioma

Inglês

Como citar

Bulletin of Engineering Geology and the Environment, v. 81, n. 5, 2022.