Logotipo do repositório
 

Publicação:
One-dimensional multi-period cutting stock problem with two stages applied to lattice slab production

Carregando...
Imagem de Miniatura

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Resumo

This study looks at a real-world production planning problem that arises in a Brazilian lattice slab factory. Based on its production, which comprises a process in two stages, the main concerns of the factory are the waste of steel trusses in the first stage, setups and inventory costs in the second stage. The proposed mathematical model is based on the one-dimensional multi-period cutting stock problem with two stages and aims at the minimization of setup, production and inventory costs, subject to capacity and demand balance constraints. To solve this model, different strategies based on the column generation procedure are implemented, where two sets of subproblems are used to provide cutting patterns for each stage. Then, different rounding strategies and the relax-and-fix heuristics are applied to identify integer solutions. We based the data set on real information from a specific factory and also from specialized websites. Computational results are used to evaluate the application of the proposed model in a realistic context.

Descrição

Palavras-chave

column generation, lattice joist production, mathematical modeling, Production planning, relax-and-fix

Idioma

Inglês

Como citar

Journal of the Operational Research Society.

Itens relacionados

Financiadores

Coleções

Unidades

Departamentos

Cursos de graduação

Programas de pós-graduação