Logo do repositório
 

One-dimensional multi-period cutting stock problem with two stages applied to lattice slab production

dc.contributor.authorBernardi, Fabricio
dc.contributor.authorPossa, Marina Gabriela
dc.contributor.authorRossi, Camila Elizandra
dc.contributor.authorBenevenuto, Luíz Guilherme Dercore [UNESP]
dc.contributor.authorNascif Junior, Iucif Abrão
dc.contributor.authorJesus, Jacqueline de
dc.contributor.authorOliveira, Barbara Cardoso de
dc.contributor.authorZanelatto, Carla
dc.contributor.authorSena, Joice Gama
dc.contributor.authorFonseca-Alves, Carlos Eduardo [UNESP]
dc.contributor.authorElias, Fabiana
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)
dc.contributor.institutionUniversidade Federal de São Carlos (UFSCar)
dc.date.accessioned2023-03-01T20:07:41Z
dc.date.available2023-03-01T20:07:41Z
dc.date.issued2022-01-01
dc.description.abstractThis study looks at a real-world production planning problem that arises in a Brazilian lattice slab factory. Based on its production, which comprises a process in two stages, the main concerns of the factory are the waste of steel trusses in the first stage, setups and inventory costs in the second stage. The proposed mathematical model is based on the one-dimensional multi-period cutting stock problem with two stages and aims at the minimization of setup, production and inventory costs, subject to capacity and demand balance constraints. To solve this model, different strategies based on the column generation procedure are implemented, where two sets of subproblems are used to provide cutting patterns for each stage. Then, different rounding strategies and the relax-and-fix heuristics are applied to identify integer solutions. We based the data set on real information from a specific factory and also from specialized websites. Computational results are used to evaluate the application of the proposed model in a realistic context.en
dc.description.affiliationUniversidade Estadual Paulista (Unesp), São Paulo
dc.description.affiliationUniversidade Federal de São Carlos (UFSCar), São Paulo
dc.description.affiliationUnespUniversidade Estadual Paulista (Unesp), São Paulo
dc.identifierhttp://dx.doi.org/10.1080/01605682.2022.2085067
dc.identifier.citationJournal of the Operational Research Society.
dc.identifier.doi10.1080/01605682.2022.2085067
dc.identifier.issn1476-9360
dc.identifier.issn0160-5682
dc.identifier.scopus2-s2.0-85131815218
dc.identifier.urihttp://hdl.handle.net/11449/240236
dc.language.isoeng
dc.relation.ispartofJournal of the Operational Research Society
dc.sourceScopus
dc.subjectcolumn generation
dc.subjectlattice joist production
dc.subjectmathematical modeling
dc.subjectProduction planning
dc.subjectrelax-and-fix
dc.titleOne-dimensional multi-period cutting stock problem with two stages applied to lattice slab productionen
dc.typeArtigo
dspace.entity.typePublication
unesp.author.orcid0000-0001-5343-6260[1]
unesp.author.orcid0000-0002-4762-2048[2]
unesp.author.orcid0000-0001-9985-6623[3]
unesp.author.orcid0000-0002-8690-1947[4]

Arquivos

Coleções