Economic analysis of the feller buncher in Brazilian Eucalyptus plantations: modeling with time series
Carregando...
Arquivos
Fontes externas
Fontes externas
Data
Orientador
Coorientador
Pós-graduação
Curso de graduação
Título da Revista
ISSN da Revista
Título de Volume
Editor
Tipo
Artigo
Direito de acesso
Arquivos
Fontes externas
Fontes externas
Resumo
In the context of increased demand for timber, forest managers must consider best practices in forest management and harvesting operations. Depending on the harvesting systems adopted, the uncertainties of the cost components may reflect the volatility of productivity and the expected value of the project. We investigated whether the uncertainties of the cost components have an influence on the productivity volatility and the expected value of the mechanized timber harvesting investment project with a feller buncher. Monthly feller buncher productivity volatilities were measured based on the absolute value of the percentage variation in the deviation of the cost and productivity components. We modeled productivity and cost components using geometric Brownian motion to estimate project value. Productivity showed a strong positive correlation with the cost components of economic depreciation, supervisor labor, fuel, and operator labor. Lubricating oil and economic depreciation were the most volatile cost components. Considering the deterministic economic analysis, the net present value was USD 3,849,619. When considering the probabilistic economic analysis, the average net present value was USD 187,319 ± USD 1,275,033. We verified that economic depreciation and fuel influenced feller buncher productivity. The uncertainties of these components affect the economic viability of the feller buncher in Eucalyptus plantations.
Descrição
Palavras-chave
Costs, forest operations, strategic decisions, timber harvesting, volatility
Idioma
Inglês
Citação
International Journal of Forest Engineering, v. 35, n. 2, p. 296-302, 2024.




