Logo do repositório

Optimal placement of uPMUs to improve the reliability of distribution systems through genetic algorithm and variable neighborhood search

dc.contributor.authorAgudo, Milton Patricio [UNESP]
dc.contributor.authorFranco, John Fredy [UNESP]
dc.contributor.authorTenesaca-Caldas, Marcelo [UNESP]
dc.contributor.authorZambrano-Asanza, Sergio
dc.contributor.authorLeite, Jonatas Boas [UNESP]
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)
dc.contributor.institutionCENTROSUR Electric Distribution Utility
dc.date.accessioned2025-04-29T20:01:54Z
dc.date.issued2024-11-01
dc.description.abstractDue to the dynamic nature of modern distribution systems, the deployment of micro-phasor measurement units (uPMU) is becoming increasingly common among utilities to improve system monitoring and reliability. However, given their high investment costs, deploying a large number of these devices becomes unfeasible. Hence, unlike other approaches found in the literature that focus on observability criteria, this work presents an algorithm for optimal placement of uPMUs aimed at improving distribution system reliability. The algorithm defines the optimal number and location of the uPMUs through an objective function based on the resolution of a fault location technique that works in conjunction with pseudo-measurements to successfully locate a contingency. The meta-heuristics Genetic Algorithm and Reduced Variable Neighborhood Search are employed to address this problem. The proposed method has been validated on a three-phase 39-bus distribution system and a real distribution feeder with 962 buses from an Ecuadorian electric distribution utility. The results obtained confirm the effectiveness of the method, as with the deployment of only two uPMUs, the energy not supplied decreases by 13.84 % and 24.96 % for the 39-bus and 962-bus systems, respectively. Moreover, in the 962-bus system, the System Average Interruption Duration Index (SAIDI) is reduced by 20.36 %.en
dc.description.affiliationDepartment of Electrical Engineering São Paulo State University – UNESP, SP
dc.description.affiliationDepartment of Planning CENTROSUR Electric Distribution Utility
dc.description.affiliationUnespDepartment of Electrical Engineering São Paulo State University – UNESP, SP
dc.description.sponsorshipFundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
dc.description.sponsorshipIdFAPESP: 2023/16829-6
dc.identifierhttp://dx.doi.org/10.1016/j.epsr.2024.110910
dc.identifier.citationElectric Power Systems Research, v. 236.
dc.identifier.doi10.1016/j.epsr.2024.110910
dc.identifier.issn0378-7796
dc.identifier.scopus2-s2.0-85199779673
dc.identifier.urihttps://hdl.handle.net/11449/305033
dc.language.isoeng
dc.relation.ispartofElectric Power Systems Research
dc.sourceScopus
dc.subjectDistribution system
dc.subjectGenetic algorithm
dc.subjectMicro-phasor measurement units
dc.subjectOptimal placement
dc.subjectReliability assessment
dc.subjectVariable neighborhood search
dc.titleOptimal placement of uPMUs to improve the reliability of distribution systems through genetic algorithm and variable neighborhood searchen
dc.typeArtigopt
dspace.entity.typePublication
unesp.author.orcid0000-0003-4995-7770[1]
unesp.author.orcid0000-0002-7191-012X[2]
unesp.author.orcid0000-0002-2639-7769[3]
unesp.author.orcid0000-0002-1204-7178[5]

Arquivos

Coleções