Logotipo do repositório
 

Publicação:
Avaliação técnica e econômica do corte de eucalipto com feller-buncher em diferentes condições operacionais

Carregando...
Imagem de Miniatura

Orientador

Coorientador

Pós-graduação

Curso de graduação

Título da Revista

ISSN da Revista

Título de Volume

Editor

Tipo

Artigo

Direito de acesso

Resumo

This study aimed to technically and economically evaluate the Feller-buncher in different conditions of harvest in eucalypt forests of second cut. The technical analysis included a study of time and movements by the method of continuous time, and operational performance was determined by volume in cubic meters of harvested wood. The economic analysis included the parameters of operational cost, harvest cost and energy consumption. The analysis of the data showed that the composition of main line harvesting and the arrangement of bundles of trees influenced operational performance. The average operational cost was US$ 86.26 per hour of actual work, which resulted in an average cost of forest harvesting of US$ 1.09 m-3.

Descrição

Palavras-chave

Costs, Forest mechanization, Productivity, Times and movements

Idioma

Português

Como citar

Ciencia Florestal, v. 20, n. 4, p. 649-656, 2010.

Itens relacionados

Financiadores

Unidades

Departamentos

Cursos de graduação

Programas de pós-graduação